NEBOSH Safety Training Course in Ahmedabad

No comments
Our delegates have successfully completed NEBOSH IGC training in Green World Group Ahmedabad.




For Enquiry & Enrollment:
Toll Free 1800 300 20676 (South India) | 1800 121 4246 (North india)
Whats App : +91 9791082789 | info.india@greenwgroup.com

Mr. Chintan - ACADEMIC COUNSELLOR
Mob: +91 8238082938
chintan.j@greenwgroup.com

Green World Management Consultants & Training Institute
11th Floor, Regus Earth
Arise Building, Near
YMCA Club, S.G. Highway
Ahmedabad 380015.
Tel : 079 -61344556

NEBOSH Course Training in Abu Dhabi Dubai UAE

No comments
Our delegates have successfully completed NEBOSH IGC training in Green World Group Abu Dhabi , UAE.



For Enquiry & Enrollment:

ACADEMIC COUNSELLOR – DUBAI
Mohamed Rafi
Mob: +971 55 7044 902
mohamed.r@greenwgroup.com

ACADEMIC COUNSELLOR – ABU DHABI
Sunit Gill
Mob: +971 55 9949 371
sunit.g@greenwgroup.com

ACADEMIC COUNSELLOR – UAE
Mr.Dinesh Babu
Mob: +971 55 3100292
dinesh.b@greenwgroup.com

Green World Management Consultants & Training Institute
Suite #102,
First Floor, Sapphire Tower,
Near Dnata, Deira, Dubai PO Box -83127.


Common Construction Accidents

No comments

Common accidents in lifting operations:


overturning of the crane:

The lifting capacity of pick and carry cranes is reduced when traversing slopes or changing direction. Reduced lifting capacity should be taken into account when planning a lift to ensure the crane does not become unstable and overturn.

Breaking the boom sling:

The auxiliary hook and headache ball with a combined weight of 30kg fell 12m from the boom of a 20t crane landing within 1.5m from the dogman and his offsider. These two workers were standing under the boom placing a sling on the main hook. The auxiliary rope had broken.

Touching overhead power lines:

It doesn't matter if its a bird, a human being or any other animal. If the potential difference across its body is zero, electricity won't flow through it and hence it would't get an electric shock.

Collision with obstacles:

In order to solve tower cranes interference and collision problems in the construction site,
the reason of group tower cranes collision in construction site is analyzed in detail and four types of
typical tower cranes collision case are summed up.

Falling objects:

Green netting that goes over buildings when they are being refaced in areas where there are a lot of pedestrians is the most recognized form, but there also is netting that is put up within the construction project, such as directly under work being done, to help stop objects from falling on workers below.